Torque-to-capacity logs and load-tables that keep every screw pile inspection-ready
Kit code: OK-HPSP
Coming soon
A field-proven workbook for contractors installing helical piers and screw piles for foundation underpinning, new-build support, and boardwalk/solar racking.
It includes a torque-to-capacity correlation calculator, pile-log templates the engineer signs off on, and a bid builder that prices by pile count, depth, and helix configuration.
A job-cost tab exposes true per-pile margin.
This kit is on the build list. Drop your email and we'll send it the day it ships — plus a
free quote calculator now. The most-requested industries get built first.
Planned modules
Torque-to-capacity correlation calculator (Kt factor by shaft diameter)
Per-pile installation log: depth, final torque, helix config, batch/serial
Bid builder priced by pile count, drive depth & mobilization
Engineer load-verification & proof-load test tracker
Site soil-condition & refusal register with photo/index links
Job-cost ledger with drive-time and equipment-hour variance
Who it is for: Requires manufacturer installer certification (e.g. CHANCE/Ideal), engineered load calcs and torque-correlation sign-off, a licensed foundation contractor status, and specialized drive-head hydraulic equipment..